Kirkcudbright Outfall Horizontal Directionally Drilled outfall for Scottish Water Solutions
Kirkcudbright Outfall
 
Ganstead - Asselby Pipeline  Horizontal Directionally Drilled crossing of River Hull near Beverly for 48" National Grid high pressure gas main
Ganstead - Asselby Pipeline
 
Cambridge Arbury Grid Phase II Installation of 15mile 132kV cable route through residential Cambridge
To Follow
 
Kinloss Outfalls Horizontally directionally drilled 780m Long Sea & 500m Short Sea Outfall for RAF base Kinloss including 3 no. diffusers
Kinloss Outfalls
 
Cross Solent Water Main 4km long Southern Water scheme to replace twin Solent pipelines between Lepe, Hampshire and Gurnard on the Isle of Wight involving directionally drilled landfalls on both sides and 2km marine section in the middle
Cross Solent Water Main
 
Hinkley Point Outfall Horizontally Directionally Drilled Outfall as enabling works for decommissioning Hinkley Point ‘A’ Power Station in Somerset. Length 670m
Hinkley Point Outfall
 
Easington Landfall Welding and installation in tunnel and trench of onshore 42” and 44” heavy wall gas pipeline for Ormen Langen project
Easington Landfall
 
Little Barford 33kV Installation of 3 no. high voltage cable circuits by horizontal directional drilling under major railway track in Little Barford
To Follow
 
Peterborough East 132kV Installation of double 132kV and double 11kV high voltage cable circuits including termination at overhead tower
Peterborough East
 
Project HAL, Enfield Installation of new double 132kV circuit for new site of News International including 3 no. drilled railway crossings and crossing of M25. Route length is approx. 5.5 km and involves working in both EDF substation as well as National Grid substation
Project HAL, Enfield
 
Humbly Grove Gas Storage Horizontal Directional Drilling under M3/A33 near Basingstoke for 24” high pressure gas main. Length 250m
Humbly Grove Gas Storage
 
Kentish Flats Offshore Windfarm 2.6km onshore cable installation: 3 no. 33kV circuits and 1 no. fibre optic cable including all jointing and terminations in sub-station
Kentish Flats Windfarm
 
Great Barford Bypass Horizontal directional drillings for installation of new 36” and 48” steel watermain for Anglian Water. Length each drilling 550m
Great Barford Bypass
 
River Crouch & Paglesham Pool, Burnham on Crouch Horizontal directional drillings for cable duct installation: 980m bundle 3xPE200 and 500m bundle 3xPE180; cable installation and jointing works on both sides
Burnham on Crouch Drilling
 
Cambridge Arbury Grid phase I Directional drillings under River Cam and roundabout and associated 33kV cable installation and jointing
Cambridge Drilling
 
Morecombe Bay Outfall Relining Cleaning and repairs of existing outfall and installation of 1000m PE liner with diameter of 1400mm for United Utilities. PE pipe produced in one length at Pipelife factory in Norway and towed to site. Outfall remained operational during activities
Morecombe Bay Relining
 
Ballywater Windfarm, Wexford, Ireland 21km 110kV cable installation in ducts for onshore windfarm of Ryland Construction. Installed individual cable lengths per section were record 1600m
To Follow
 
Accordis Outfall Relining, Grimsby Cleaning and relining of 200m existing effluent outfall with diameter of 500mm on Humber mud flats for Accordis. Temporary bypass of outfall during works ensured operations at plant were not affected
Accordis Outfall
 
Clifton Marsh Outfall Removal of existing outfall and installation of twin outfall with diameter of 1880/1640mm in open trench across flood bank and mud flats. Client United Utilities
Clifton Marsh Outfall
 
Crediton Sewer Requistion Design & Construct horizontal directional drilling to install gravity sewer for new housing estate from top of a hill to the bottom
Crediton Sewer Requistion
 
West Byfleet Railway Crossing Design & Construct horizontal directional railway crossing for EDF Energy
West Byfleet Railway Crossing
 
Ashlett Creek Outfall Extension Extension of existing outfall by 80m PE800mm into Southampton Water including removal of diffuser & marker post
Ashlett Creek Outfall Extension
 
 