 |
Kirkcudbright Outfall |
Horizontal Directionally Drilled outfall for Scottish Water Solutions |
|
| |
 |
Ganstead - Asselby Pipeline |
Horizontal Directionally Drilled crossing of River Hull near Beverly for 48" National Grid high pressure gas main |
|
| |
 |
Cambridge Arbury Grid Phase II |
Installation of 15mile 132kV cable route through residential Cambridge |
|
| |
 |
Kinloss Outfalls |
Horizontally directionally drilled 780m Long Sea & 500m Short Sea Outfall for RAF base Kinloss including 3 no. diffusers |
|
| |
 |
Cross Solent Water Main |
4km long Southern Water scheme to replace twin Solent pipelines between Lepe, Hampshire and Gurnard on the Isle of Wight involving
directionally drilled landfalls on both sides and 2km marine section in the middle |
|
| |
 |
Hinkley Point Outfall |
Horizontally Directionally Drilled Outfall as enabling works for decommissioning Hinkley Point ‘A’ Power Station in Somerset. Length 670m |
|
| |
 |
Easington Landfall |
Welding and installation in tunnel and trench of onshore 42” and 44” heavy wall gas pipeline for Ormen Langen project |
|
| |
 |
Little Barford 33kV |
Installation of 3 no. high voltage cable circuits by horizontal directional drilling under major railway track in Little Barford |
|
| |
 |
Peterborough East 132kV |
Installation of double 132kV and double 11kV high voltage cable circuits including termination at overhead tower |
|
| |
 |
Project HAL, Enfield |
Installation of new double 132kV circuit for new site of News International including 3 no. drilled railway crossings and crossing of M25.
Route length is approx. 5.5 km and involves working in both EDF substation as well as National Grid substation |
|
| |
 |
Humbly Grove Gas Storage |
Horizontal Directional Drilling under M3/A33 near Basingstoke for 24” high pressure gas main. Length 250m |
|
| |
 |
Kentish Flats Offshore Windfarm |
2.6km onshore cable installation: 3 no. 33kV circuits and 1 no. fibre optic cable including all jointing and terminations in sub-station |
|
| |
 |
Great Barford Bypass |
Horizontal directional drillings for installation of new 36” and 48”
steel watermain for Anglian Water. Length each drilling 550m |
|
| |
 |
River Crouch & Paglesham Pool, Burnham on Crouch |
Horizontal directional drillings for cable duct installation: 980m bundle 3xPE200 and 500m bundle 3xPE180;
cable installation and jointing works on both sides |
|
| |
 |
Cambridge Arbury Grid phase I |
Directional drillings under River Cam and roundabout and associated 33kV cable installation and jointing |
|
| |
 |
Morecombe Bay Outfall Relining |
Cleaning and repairs of existing outfall and installation of 1000m PE liner with diameter of 1400mm for
United Utilities. PE pipe produced in one length at Pipelife factory in Norway and towed to site. Outfall
remained operational during activities |
|
| |
 |
Ballywater Windfarm, Wexford, Ireland |
21km 110kV cable installation in ducts for onshore windfarm of Ryland Construction.
Installed individual cable lengths per section were record 1600m |
|
| |
 |
Accordis Outfall Relining, Grimsby |
Cleaning and relining of 200m existing effluent outfall with diameter of 500mm on Humber
mud flats for Accordis. Temporary bypass of outfall during works ensured operations at plant
were not affected |
|
| |
 |
Clifton Marsh Outfall |
Removal of existing outfall and installation of twin outfall with diameter of 1880/1640mm in open trench across
flood bank and mud flats. Client United Utilities |
|
| |
 |
Crediton Sewer Requistion |
Design & Construct horizontal directional drilling to install gravity sewer for new housing estate from top
of a hill to the bottom |
|
| |
 |
West Byfleet Railway Crossing |
Design & Construct horizontal directional railway crossing for EDF Energy |
|
| |
 |
Ashlett Creek Outfall Extension |
Extension of existing outfall by 80m PE800mm into Southampton Water including
removal of diffuser & marker post |
|